Not included

TAXES AND EXPENSES NOT INCLUDED



  • VAT on the house (10%)
  • Property Transfer Tax (ITP) on the land (10%) or, in some cases, VAT on the land (21%)
  • Notary fees for the purchase of the land
  • Building permit: between 3.5% and 4% of the price of the house (excluding the land)
    *Some municipalities may require a security deposit
  • Municipal fees, technical certificates, street closure permits, waste management, containers, and soil disposal to landfill
  • Costs associated with post-construction formalities after obtaining the Final Works Certificate, including legalization and registration of the property:
  • Certificate of occupancy
  • First occupancy license
  • Building description certificate
  • Declaration of new construction
  • Stamp duty
  • Building logbook
  • Energy performance certificate (design and final stages)
  • Cadastral registration, etc.



WORKS AND ITEMS NOT INCLUDED



  • Perimeter fence
  • Swimming pool
  • Garage
  • Garden
  • Terraces, pergolas and other outdoor elements
  • Possible construction fence (according to municipal requirements)
  • Outdoor paving
  • Household appliances
  • Large windows (over 140 × 210 cm)
  • Rainwater tanks for garden irrigation
  • Main utility meters (electricity, water, sewage)
  • Rental of generator and water tank during construction
  • Tree felling
  • Earthworks: the price includes what is foreseen for flat land, always on firm ground and without any complications.
  • The type of final foundation, various movements, and the excavation for the swimming pool will always be determined during the earthworks phase under the supervision of the Architect.
  • Any price modification will be evaluated separately (rocks, clay, slopes, ramps, ...).



We have a network of collaborating companies for whatever the buyer requires