Not included

TAXES AND EXPENSES NOT INCLUDED



  • VAT on the house (10%)
  • Property Transfer Tax (ITP) on the land (10%) or, in some cases, VAT on the land (21%)
  • Notary fees for the purchase of the land
  • Building permit: between 3.5% and 4% of the price of the house (excluding the land)
    *Some municipalities may require a security deposit
  • Municipal fees, technical certificates, street closure permits, waste management, containers, and soil disposal to landfill
  • Costs associated with post-construction formalities after obtaining the Final Works Certificate, including legalization and registration of the property:
  • Certificate of occupancy
  • First occupancy license
  • Building description certificate
  • Declaration of new construction
  • Stamp duty
  • Building logbook
  • Energy performance certificate (design and final stages)
  • Cadastral registration, etc.



WORKS AND ITEMS NOT INCLUDED



  • Swimming pool
  • Garage
  • Possible construction fencing (as required by some municipalities)
  • Outdoor paving
  • Terraces, pergolas, and other exterior elements
  • Appliances
  • Landscaping / garden
  • Large windows (larger than 140 × 210 cm)
  • Water tanks
  • Main utility meters (electricity, water, sewage)
  • Utility consumption during construction
  • Perimeter fencing
  • Tree felling
  • Earthworks: The price includes work planned for flat terrain, always on firm ground and without any complications.
  • The type of final foundation, various movements, and excavation for the pool are always determined during the earthworks phase under the supervision of the Architect.
  • Any modifications to the price will be assessed separately. (Rocks, Clay, Slopes, Ramps, etc.)



We have a network of collaborating companies for whatever the buyer requires